BuildCrunch

Crunch the numbers before you build.

Concrete Calculator

Calculate exactly how much concrete you need for slabs, footings, columns, and stairs. Stop overpaying at the mixer.

By BuildCrunch Team · Last updated July 17, 2026

Quick Answer

A 20×10 ft slab at 4 inches deep needs about 2.47 cubic yards of concrete — roughly $370 in material cost before waste, or about $407 with the standard 10% waste factor included.

ft
ft
in
units
%

Your Estimate

Volume
0.00cu ft
Ready Mix
0.00cu yd
Est. Cost
0@ $150/yd

Pre-Mixed Bags Needed

0
40-lb bags
0
60-lb bags
0
80-lb bags

How It's Calculated

For slabs and footings, we multiply length × width × depth (converted from inches to feet) to get cubic feet, then divide by 27 — since one cubic yard equals 27 cubic feet.

For columns, we use the cylinder formula: π × radius² × height. For stairs, we sum the volume of each individual step plus the base slab beneath them.

Your waste percentage (5-15% depending on the project) is added last, since it's cheaper to over-order slightly than to run short mid-pour.

Save this estimate

Get a copy emailed to you, or connect with local pros for a real quote.

Frequently Asked Questions

How much does a cubic yard of concrete cost?

Ready-mix concrete typically costs $125-$175 per cubic yard delivered, depending on your location and mix design. Standard residential mix (3,000-4,000 PSI) is on the lower end, while high-strength or specialty mixes cost more. Delivery fees usually range from $50-$100 per truck.

How many bags of concrete do I need for a 10x10 slab?

A 10×10 foot slab at 4 inches deep requires about 1.23 cubic yards of concrete. That's roughly 56 bags of 80-lb pre-mixed concrete, 67 bags of 60-lb, or 112 bags of 40-lb. For anything over 1 cubic yard, ordering ready-mix delivery is usually more cost-effective than bags.

Should I add extra concrete for waste?

Yes — always add 5-10% for standard projects. Add 10-15% if the ground is uneven, the formwork is irregular, or it's your first pour. It's far cheaper to return unused bags than to run short mid-pour, which can compromise structural integrity.

How long does concrete take to cure?

Concrete reaches about 70% of its rated strength in 7 days and 90%+ in 28 days. You can walk on it after 24-48 hours, drive on it after 7 days, and it reaches full design strength at 28 days. Keep it moist for the first week for best results.

Can I mix my own concrete instead of ordering ready-mix?

For small jobs under 1 cubic yard — a fence post base, a small stepping pad — bagged concrete mixed on-site makes sense. Above 1 cubic yard, ready-mix delivery is almost always cheaper and far less labor, since mixing by hand or with a rented mixer for anything larger eats up a full day and risks inconsistent batches.

What's the difference between 3,000 PSI and 4,000 PSI concrete?

PSI measures compressive strength after 28 days of curing. 3,000 PSI is the standard for sidewalks, patios, and non-structural slabs. 4,000 PSI costs slightly more per yard but is recommended for driveways, garage floors, and anywhere vehicles will park, since it resists cracking and freeze-thaw damage better.